Thursday, 19 September 2013
BTEC
Produce a list of components you think you will need to do in order to build the car. Look at techniques for its construction. Welding machining GRP etc.
Wednesday, 4 September 2013
Cambridge Uni solar car.
Try this as an idea for getting your ideas flowing .
http://www.cam.ac.uk/research/news/new-and-under-the-sun
http://www.cam.ac.uk/research/news/new-and-under-the-sun
Tuesday, 11 June 2013
Deadline date
Hi we need to finish off the unit by the second last week of term. Unit 307. If you fail to complete by then there is no extension!
Best regards
Best regards
Wednesday, 30 January 2013
Unit 305 LOL1
Hi Chaps here is the mark scheme for LOL1 to help you check you are on the right lines
Guidance for allocating marks
This
section provides further guidance for the assessor on how to award marks within
each mark
band in an
objective way.
Marking
grid A
Assessment
focus LO.1.1
Mark Band
1–3
(0–9 marks)
There are
typically up to 2 marks for each of the two descriptions, but could
go to 3
marks if either the consequences of failure or the effect on
production
is answered well and above that required for this mark band but
up to a
maximum of 4 marks.
Up to 2
marks can be awarded for the explanation of the effects and should
be based on
the how well it shows the effects are appropriate to customer
expectation
and corporate image and 1 mark can be awarded for linking
image and
customer expectation within the explanation.
Up to 2
marks could be awarded for indicate why consequences affect
corporate
image; this could be in the form of advantages and limitations.
Sunday, 20 January 2013
Unit 305 Snow work
Dear All
If you can look at Unit 5 as we have just started this unit. . I recommend you look at the mark scheme as we have been doing in class as this will assist in getting the marks clearly allocated for Learning Objective LOL1
You will have downloaded this into your area already.
You need to clearly identify 2 areas. of maintenance. Suggest areas of System failure, such as the case study on the Bombadeir undercarriage, Rail signal failure
Mark Band 1–3
(0–9 marks)
There are typically up to 2 marks for each of the two descriptions, but could
go to 3 marks if either the consequences of failure or the effect on
production is answered well and above that required for this mark band but
up to a maximum of 4 marks.
Up to 2 marks can be awarded for the explanation of the effects and should
be based on the how well it shows the effects are appropriate to customer
expectation and corporate image and 1 mark can be awarded for linking
image and customer expectation within the explanation.
Up to 2 marks could be awarded for indicate why consequences affect
corporate image; this could be in the form of advantages and limitations.
If you can look at Unit 5 as we have just started this unit. . I recommend you look at the mark scheme as we have been doing in class as this will assist in getting the marks clearly allocated for Learning Objective LOL1
You will have downloaded this into your area already.
You need to clearly identify 2 areas. of maintenance. Suggest areas of System failure, such as the case study on the Bombadeir undercarriage, Rail signal failure
Mark Band 1–3
(0–9 marks)
There are typically up to 2 marks for each of the two descriptions, but could
go to 3 marks if either the consequences of failure or the effect on
production is answered well and above that required for this mark band but
up to a maximum of 4 marks.
Up to 2 marks can be awarded for the explanation of the effects and should
be based on the how well it shows the effects are appropriate to customer
expectation and corporate image and 1 mark can be awarded for linking
image and customer expectation within the explanation.
Up to 2 marks could be awarded for indicate why consequences affect
corporate image; this could be in the form of advantages and limitations.
Wednesday, 16 January 2013
New Unit 305
Hi chaps
Pleased with the exam and your feedback from it. Looks like you should have done well and you appeared to have got the majority of the marks in the feedback session. Well done
We have now started Unit 5 and this is the maintenance unit . Following the lesson ensure you have downloaded all the unit documentation into your area.. I need you to research
Plant equipment and system with a view to maintanence so you have a clear view tto this before next lesson. That way we can start unit 5 LO1.1 and have an idea as to covering 2 areas
See if you cxn find some examples of these failures, Plane rail crashes etc.
Mark Band 1–3
(0–9 marks)
There are typically up to 2 marks for each of the two descriptions, but could
go to 3 marks if either the consequences of failure or the effect on
production is answered well and above that required for this mark band but
up to a maximum of 4 marks.
Up to 2 marks can be awarded for the explanation of the effects and should
be based on the how well it shows the effects are appropriate to customer
expectation and corporate image and 1 mark can be awarded for linking
image and customer expectation within the explanation.
Up to 2 marks could be awarded for indicate why consequences affect
corporate image; this could be in the form of advantages and limitations.
Pleased with the exam and your feedback from it. Looks like you should have done well and you appeared to have got the majority of the marks in the feedback session. Well done
We have now started Unit 5 and this is the maintenance unit . Following the lesson ensure you have downloaded all the unit documentation into your area.. I need you to research
Plant equipment and system with a view to maintanence so you have a clear view tto this before next lesson. That way we can start unit 5 LO1.1 and have an idea as to covering 2 areas
See if you cxn find some examples of these failures, Plane rail crashes etc.
Mark Band 1–3
(0–9 marks)
There are typically up to 2 marks for each of the two descriptions, but could
go to 3 marks if either the consequences of failure or the effect on
production is answered well and above that required for this mark band but
up to a maximum of 4 marks.
Up to 2 marks can be awarded for the explanation of the effects and should
be based on the how well it shows the effects are appropriate to customer
expectation and corporate image and 1 mark can be awarded for linking
image and customer expectation within the explanation.
Up to 2 marks could be awarded for indicate why consequences affect
corporate image; this could be in the form of advantages and limitations.
Friday, 30 November 2012
Health and Safety at work Act 1974 Powerpoint
lThis topic explores the impact of health and safety legislation on the way that manufacturing operations are carried out in engineering business.
lHealth and Safety at work Act 1974
lFactories Act 1961
lPUWER 1998
lCOSHH 2002
lRIDDOR 1995
lConstruction (Design and Management)2007.
Control Measures
Subscribe to:
Posts (Atom)